Hail Damage Roof STL · Straight after
A Roof Under One Year Old Took Hail: Date the Marks Before You Decide
A roof under a year old can still take hail. Date the marks, keep the install paperwork, and ask what to check before you choose a repair.
A roof that went on within the last year is supposed to be the one you stop thinking about. Then a hailstorm comes through, you walk the yard, and you find a dented downspout cap or a pitted vent, and the question lands on a roof that is barely broken in. Did this hail hit the new roof, or was the mark already there when the crew left? The answer decides what you do next, and it is much easier to answer while the work is still fresh in everyone's memory.
Storm and hail
Hail leaves marks on asphalt shingles that change over time. A fresh hit usually shows as a spot where granules have been knocked loose and the mat underneath is exposed. The edges are sharp, and the granules around the spot look settled. An old hit has had weather work on it. The edges round off, the exposed mat dulls, and in St. Louis the freeze and thaw cycle keeps opening up any spot that was already damaged. On a young roof those differences are easier to see than on an old one, because the surface has had little time to weather. That helps. It also means a mark can look fresh even when it came from a storm that passed before the shingles went on.
Start with the calendar, because the calendar is the one thing you can prove with paper. Write down the install start date and the day the crew finished, taken from your contract, your invoice, or the closeout packet. Then write down the date of every storm you know about, including any that came through while the roof was still open. If your roof had exposed decking or partly installed shingles during a storm, the marks from that period belong to the open roof, and the crew that had the roof open is the one who should be asked about them. A roof that was finished and then hit is a different question, and it needs a different set of records.
Dating the marks on a young roof
Photographs carry a date only if you keep them that way. Turn on date and time stamps on your phone before you walk the yard. Shoot the roof from the ground in good light, because a low sun across the surface shows hits that noon light flattens out. Take one wide photo of each slope so the slope is identifiable, then a closer shot of a few marks with a coin or a ruler in the frame for scale. Shoot each slope on its own, and note which way the wind was blowing on the storm day if you know it. Keep the original files, not screenshots or texts, because the original keeps the original timestamp.
The bundle label and the wrapper are the other half of the record. Each bundle carries a product name and a plant or lot code, and the wrapper stays with the job if you ask for it. Keys installs Atlas and Malarkey shingles only, so the product on your roof should match one of those two lines. If a piece from the lot is kept with a label, a future repair can be matched to the same shingle, which matters more than most people expect when the roof is only a year old. Ask the crew to leave the wrapper or the label information in your folder, and write the lot code next to the install date on the same sheet.
Mark each hit you can find with a number, not a color, because chalk fades and tape comes off. Put the number on a simple sketch of the roof with the slopes named, so that the photograph, the sketch, and the written list all match. A list that says "five spots on the south slope, two on the west" is weaker than a sketch with each spot numbered and photographed. If a number later points to a spot that was not on the list, you know the list was incomplete, and you can say so in writing.
Where the contractor fits, and where the insurer does
If an insurance claim is part of the picture, the policy and your insurer govern that process. Missouri law (RSMo 407.725) forbids a roofing contractor from representing or negotiating a homeowner's insurance claim, and that prohibition applies whatever the contractor's relationship to the homeowner. What a contractor can do is document the damage, put a written scope with photos and measurements in your hands, and attend as the contractor while you deal with your own insurer. Keep your own copy of everything, and keep the dates straight.
What it costs
A repair on a young roof is priced by what is actually broken. A few isolated hits on one slope are a different job from a hail pattern across every plane, and a whole slope that needs replacement is a different job again. The count matters more than the square footage, because each hit needs a shingle pulled, nails removed, and a replacement set and sealed. Ask for the count in the written scope, and ask how the count was taken, from the photographs or from a walk.
Cold changes the price too. Asphalt shingles that have been out in a freeze can crack when they are lifted, and a repair that cracks the shingles beside it is worse than the hit it was meant to fix. If the shingles will not bend without breaking, a repair may need to wait for a warmer day, and that wait can add a visit to the bill. Ask the contractor what temperature they will stop lifting shingles at, and get that answer in writing before the date is set.
Warranty terms come from the shingle maker and from the installer's written paperwork. The length and the conditions are written there, not on this page, so read them rather than relying on a summary. A young roof that is still inside those terms may have its own steps for reporting damage, and those steps often want dated photos and the install date. Keep the closeout packet in one place with the photo folder.
What to ask
Before you agree to a repair or a re-inspection on a young roof, ask these questions and get the answers in writing.
- Which slopes were walked, on what date, and will the timestamped photo log come to me in its original files?
- Will each hit be numbered on a sketch that matches the photographs?
- What install start and finish dates appear in your records, and do they match the date the crew says the roof was closed?
- What shingle line and lot code went on the roof, and where is that recorded?
- If any of the damage came from a storm during the open period, who does the contractor say is responsible for it, and in what document?
- At what temperature will the crew stop lifting shingles, and what happens to a spot repair if the shingles will not bend?
- Is the repair written as a scope with the count, the materials, and the photographs attached?
- If a city or county permit is needed, which desk pulls it, and who receives the final?
- What does the closeout packet contain, and when do I receive it?
If you want Keys to walk the roof, photograph each slope, and write the hits into a dated scope, call the office at (314) 220-2333.
Keys Roofing
Get the roof documented while it is still fresh
This desk is published by Keys Roofing, the roofing, gutter and downspout contractor for greater St. Louis. When you are ready for someone on the roof with a camera, this is the crew that climbs it.
- Licensed and insured, greater St. Louis
- Atlas and Malarkey shingles, installed by the company you call
- Roofing, gutters and downspouts. Nothing else.
- Every photograph on this desk is a real Keys jobsite
Quicker by phone(314) 220-2333
Step ten, today
Send it, get a callback
Send it with the storm date and what you saw from the ground. The office rings back to set a time.